24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

API 620 low-pressure oil storage tanks snow load

API 620 low-pressure oil storage tanks snow load

API 620 low-pressure oil storage tanks snow load

Generally speaking, the duration of the "exhalation" of the API 620 low-pressure oil storage tanks is longer than that of the "inhalation" of the API 620 low-pressure oil storage tanks every day. There are many factors affecting the "small breathing" loss, mainly including the following points: the change of temperature difference between day and night, sunshine time of the API 620 low-pressure oil storage tanks location, open area of the API 620 low-pressure oil storage tanks, atmospheric pressure, filling degree of API 620 low-pressure oil storage tanks, etc. When the API 620 low-pressure oil storage tanks is full of gas, the space volume is small, and the "small breathing" loss is less; if the space volume is large, the loss is also large.

Allowable Design Stresses
The maximum allowable design stresses for the API 620 low-pressure oil storage tanks materials outlined in Q.2.1 shall be in accordance with Table Q-3.The values for the allowable design tensile stress given in Table Q-3 for materials other than bolting steel are the lesser of (a) 331/3% of the specified minimum ultimate tensile strength for the material or (b) 662/3% of the specified minimum yield strength, but they are 75% of the specified minimum yield strength for the stainless steel, nickel alloy, and aluminum materials. Allowable test stresses are based on the limitation of API 620 oil tank storage standard Q.8.1.3.

The welded API 650 tank in various sizes and capacities for internal pressures approximating atmospheric pressure (internal pressures not exceeding the weight of the roof plates), but a higher internal pressure API 620 low-pressure oil storage tanks is permitted when additional requirements are met.

We should focus on the main problems to be solved and pay attention to efficiency. After receiving the user's quality objection report data, the possible causes, responsible units, compensation amount, etc. of the problem shall be judged based on experience. To have a clear service plan, to be clear about what your main problem is, what technical support is needed, these should be prepared.

Previous : API 620 oil storage tank material seismic use group iii

Next : fixing roof oil storage tank gauging device

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12