24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

API650 bolted steel tanks for oil project maximum allowable stress for walls

API650 bolted steel tanks for oil project maximum allowable stress for walls

API650 bolted steel tanks for oil project maximum allowable stress for walls

The engineering quality of API650 bolted steel tanks for oil project not only affects production and operation, but also affects the life safety of the staff. The factors affecting the API650 bolted steel tanks for oil project construction quality are all aspects, any link, any part of the problem will affect the whole project, so the quality management is paid more and more attention. How to ensure the engineering construction quality of oil tank? First, make API650 bolted steel tanks for oil project construction technical preparation carefully, understand the design intent, master the construction acceptance specification, and make detailed construction technical disclosure to the construction team.

Under the same sealing effect, the internal floating roof tank of API 650 oil storage tank can further reduce the evaporation loss compared with the API650 bolted steel tanks for oil project external floating roof tank. This is due to the shielding of the fixed roof and the gas layer between the fixed roof and the internal floating plate, which has more significant heat insulation effect than the double disc floating roof of the API650 bolted steel tanks for oil project external floating roof tank. =====
API 650 tank has the advantages of less load on the floating plate, simple and light structure, and can save the central drainage pipe and rotating floating ladder on the API650 bolted steel tanks for oil project floating plate. The materials for easy construction and maintenance and sealing parts can avoid aging due to sunlight.

We have a high-quality elite team, with a wealth of steel products resources and business experience. The company has established a perfect career development channel to provide all employees with broad job development opportunities, clear career planning, so that the potential can be fully explored, talent can be fully exploited, and a platform for employees to realize the value of life can be built, so as to realize the common growth and development with employees in the long-term development of the company.

Determination of Required Capacity
The aggregate capacities required for any vent valves, pressure-relieving valves, and/or vacuum-relieving valves to be provided should be determined as follows:
a)For thermal breathing and product movement, the rules given in API 2000 shall be followed. The required capacity as the result of the product movement into the tank API650 bolted steel tanks for oil project given in API 2000, shall be multiplied by the ratio of the absolute tank pressure to atmospheric pressure (14.7 lbf/in.2 absolute).
b)For supplemental safety pressure-relieving devices to take care of extra venting capacity required in case of external fire exposure, the rules in API 2000 shall be followed.

Previous : welded steel tank for sale designed and constructed for elevated temperature service

Next : API620 steel storage tank shapes temperature

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12