LNG storage yanks tests of new design

LNG storage yanks tests of new design

LNG storage yanks tests of new design

The structure of the LNG storage yanks foundation mainly includes the insulating anticorrosion layer on the top surface of the foundation, the tank wall support, the edge retaining structure, the sand cushion, the oil and water barrier, the detection signal tube and other structures. The construction materials and requirements of each basic structure of the storage tank are different. After the structure of the LNG storage yanks foundation is built in accordance with the construction requirements, the settlement of the storage tank foundation needs to be observed, and the uneven settlement value of the storage tank foundation should be within the allowable safety range.

Any joints between the adjacent sections of API 620 oil storage tank stiffening rings, as shown in Figure Q-1, shall be made so that the required moment of inertia of the combined ring-shell section is provided. Weld joints between adjacent sections shall be made with full-thickness and full-penetration butt-welds. Stiffening-ring butt-welds may employ metal backing strips. Backing strips and the associated welding shall be made in a manner that provides a smooth contour in the rat hole and all other weld joint ends. All weld passes shall be started at the rat hole and other weld joint ends and shall be completed by moving away from these ends. Passes shall be overlapped away from edges to provide a smooth continuous weld.

API 650 Tanks in which liquid fluids are stored and designed to withstand atmospheric pressure operation, less than 18 kPa, or internal pressures not exceeding the weight of the LNG storage yanks roof, with temperatures no higher than 93, 3 C are included in the scope of this design code.

When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.

Previous : 200ft diameter api620 tank welding

Next : LNG containment and insulation systems vacuum testing

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12