The hardness of the welds contacting these environments, including the heat-affected zones, shall be considered. The weld metal and adjacent heat-affected zone often contain a zone of hardness that is well in excess of a value of 22 on the Rockwell C scale and could be expected to be more susceptible to cracking than would unwelded metal. Any hardness criteria shall be a matter of agreement between the Purchaser and the gasoline steel storage tanks manufacturer and shall be based on an evaluation of the expected hydrogen sulfide concentration in the product, the possibility of moisture being present on the inside metal surface, and the strength and hardness characteristics of base metal and weld metal.

The lip seal of floating roof storage tank, gasoline steel storage tanks relies on the sliding contact between elastic lip and tank wall. This kind of seal has strong applicability, but the requirements of manufacturing technology and material selection are high, and the determination of elastic seal also exists. The secondary seal of floating roof storage tank, gasoline steel storage tanks is to add a seal on the basis of primary seal. It is proved by experiments that the secondary seal can reduce the liquid consumption by more than 50%, and has a more significant effect in safety.

This standard only applies to API 650 storage tanks gasoline steel storage tanks with uniform bottom support and non-refrigerated service storage tanks with a maximum design temperature of not more than 93 degrees Celsius (200 degrees Fahrenheit).

When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.

Previous : EN 10025 S355J0 plates naphtha steel storage tank

Next : API620 round-bottom frac tanks impulsive water parameters

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12