24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

A516 Gr 450 plates API650 petroleum storage tank

A516 Gr 450 plates API650 petroleum storage tank

A516 Gr 450 plates API650 petroleum storage tank

The main content of the inspection of the safety management of metal atmospheric API650 petroleum storage tank is whether the filed data of the storage tanks are complete; whether the operators have received safety management training; whether the problems detected in the past have been resolved. The main inspection content of the tank body of the metal atmospheric pressure storage tank is whether the tank top, tank wall, and bottom plate of the storage tank are deformed, dented, seepage and perforation, etc.; whether the API650 petroleum storage tank accessories are complete and whether there are any abnormalities; No sinking, tilting, etc.

For floating roof API 650 tanks, the net working capacity is the liquid volume contained between the API650 petroleum storage tank maximum operating level (300 mm below rim for metallic type seals and 600 mm below rim for fabric type seals) and the minimum operating level (API 650 tanks roof supports clearing the tank bottom by 25 mm while set at the operating position).

Management concept: abide by laws, regulations and social norms. To improve the system of management, to carry out activities with high corporate ethics. Mutual respect, unity and harmony, create a "fair, just and open" good working environment for employees. Forge ahead, constantly pursue new technology innovation, create social value, and become a sustainable growth enterprise.

Qualifications of API 620 Storage Tanks ExaminersExaminers for tanks constructed according to the rules in this standard shall have had not less than 5 years experience in design, construction, maintenance and/or repair, or in the responsible supervision of the construction, maintenance and/or repair of various types of unfired pressure vessels and/or API650 petroleum storage tank tanks, including at least 1 year of experience in the construction or supervision of the construction of vessels or tanks by fusion welding. Satisfactory completion of a suitable course of training approved by the Purchaser or the Purchaser’s agent may be substituted for 3 of the 5 years experience. However, training cannot replace more than 6 months of the required experience on fusion-welding construction.

Previous : 1060 aluminum tube steel storage tank for oil distribution

Next : API650 petroleum storage tanks piping flexibility

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12