24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

api 650 crude oil storage tank standard pdf welded joint efficiency

api 650 crude oil storage tank standard pdf welded joint efficiency

api 650 crude oil storage tank standard pdf welded joint efficiency

Prefabrication requirements of api 650 crude oil storage tank standard pdf, large vertical storage tank wall panels:
1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.
2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.
3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.

Qualifications of API 620 Storage Tanks ExaminersExaminers for tanks constructed according to the rules in this standard shall have had not less than 5 years experience in design, construction, maintenance and/or repair, or in the responsible supervision of the construction, maintenance and/or repair of various types of unfired pressure vessels and/or api 650 crude oil storage tank standard pdf tanks, including at least 1 year of experience in the construction or supervision of the construction of vessels or tanks by fusion welding. Satisfactory completion of a suitable course of training approved by the Purchaser or the Purchaser’s agent may be substituted for 3 of the 5 years experience. However, training cannot replace more than 6 months of the required experience on fusion-welding construction.

API 650 petroleum storage tank specifications and standards are documents verified by the customer (owner) under different operating conditions; however, api 650 crude oil storage tank standard pdf it must be verified whether these API 650 petroleum storage tank documents are suitable for use and whether they comply with applicable design specifications and/or specifications.

In December of 2015, our regular India customer sent us an inquiry for api 650 crude oil storage tank standard pdf pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Previous : api 620 crude oil storage tank free download pdf annular plate

Next : api 650 crude oil storage tank specification slot welds

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12