Cement silo system facilities for inspector

Cement silo system facilities for inspector

Cement silo system facilities for inspector

The mechanical seal of floating roof Cement silo system relies on mechanical force to press the sealing steel plate tightly against the tank wall, so that it can slide on the tank wall and avoid gap as far as possible. However, mechanical seal has high requirements for the geometry of storage tank and poor adaptability, so mechanical seal is rarely used in newly built floating roof Cement silo system.

Cement silo system Pressure-relieving DevicesTanks shall be protected by automatic pressure-relieving devices that will prevent the pressure at the top of the tank from rising more than 10% above the maximum positive gauge pressure except as provided in API 620 standard 9.2.2.Where an additional hazard can be created by the exposure of the tank to accidental fire or another unexpected source of heat external to the tank, supplemental pressure-relieving devices shall be installed. These devices shall be capable of preventing the pressure from rising more than 20% above the maximum positive gauge pressure. A single pressure-relieving valve may be used if it satisfies the requirements of this paragraph and 9.2.1.

Selection of nominal diameter D of API 650 storage tank. In the design calculation of API 650 storage tank, the bottom plate thickness is the net plate thickness, that is, the actual thickness minus the corrosion allowance. In the design and calculation of Cement silo system wall thickness in hydrostatic test, the thickness of bottom plate is the total thickness of steel plate.

In December of 2015, our regular India customer sent us an inquiry for Cement silo system pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Previous : Slag powder silo roof nozzles

Next : steel silo liner charpy v-notch impact values

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12