24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

crude oil steel storage tank welding allowable stress design (asd) methods

crude oil steel storage tank welding allowable stress design (asd) methods

crude oil steel storage tank welding allowable stress design (asd) methods

The manufacturing requirements of bottom plate of vertical metal tank, crude oil steel storage tank welding are as follows: 1. In order to compensate welding shrinkage, the layout diameter of tank bottom is 5-2mm than the design diameter; 2. The butt joint of edge plate of tank bottom shall be machined automatically or semi-automatically; 3. The distance between any two adjacent welding joints on the tank bottom plate and the distance between the butt joint of edge plate and the longitudinal weld of bottom ring wall plate shall not be greater than 200 mm.

A cylindrical nozzle with a 12-in. inside diameter is located in solid plate in the sidewall of a cylindrical storage tank 60 ft in diameter so that its axis lies in a horizontal plane and forms an angle of 55° with a perpendicular to the sidewall at the point of intersection, as shown in Figure F-7. The thickness of the crude oil steel storage tank welding sidewall plate, tw, in this area is 5/8 in., and no corrosion allowance is required. The total internal pressure, Pl + Pg, at the center of the opening is 26.1 lbf/in.2 gauge.

Compared with the fixed roof API 650 oil storage tank without crude oil steel storage tank welding floating roof, there is no evaporation space. In principle, this eliminates the so-called "large breathing loss". Evaporation not only causes the loss of product quantity, but also affects the quality of crude oil steel storage tank welding product and pollutes the environment.

In December of 2015, our regular India customer sent us an inquiry for crude oil steel storage tank welding pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Previous : API620 Aromatics steel storage tanks single openings

Next : kerosene steel storage tanks nozzle wall thickness

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12