GB 50128 steel tank with a ringwall foundation

GB 50128 steel tank with a ringwall foundation

GB 50128 steel tank with a ringwall foundation

GB 50128 steel tank construction must adhere to the design drawings, acceptance specifications and construction plans. If the design needs to be modified during GB 50128 steel tank construction, it must be approved by the original design unit or Party A’s representative and relevant personnel of the supervision unit, and written visa procedures must be completed in advance. The equipment and main materials used in the oil tank construction project must have certificates of conformity and quality assurance.

For all API 620 crude oil tank other materials, the impact test temperature shall be at least 30°F colder than the design metal temperature. Alternately, materials impact tested at the design metal temperature or lower with Charpy impact test energy value of 25 ft-lb (average), 20 ft-lb (minimum) are acceptable for design metal temperatures above –40°F. GB 50128 steel tank materials with an energy value of 30 ft-lb (average), 25 ft-lb (minimum) are acceptable for design metal temperatures of –40°F or lower.

In Appendix E to API 650 oil storage tank, the maximum values of inertia force, pulse pressure and convection pressure are superimposed, and tend to be conservative.In GB50341, only pulse pressure is calculated for GB 50128 steel tank tanks below 5000 m.

First of all, we should establish a correct concept of after-sales service. Service concept is an important part of corporate culture and a long-term enterprise value concept. Our company's after-sales service embodies the concept of "customer first, sincere service for customers". As long as we are in the "sincere service for users" under the guidance of the idea, I believe we will get rich returns.

Previous : Simplified design requirements for API tank 650 oil tank pdf

Next : Bolted & welded steel storage tanks bottom plate cutting

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12