24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

LNG vacuum cryogenic liquid storage tank fillet-weld cross section

LNG vacuum cryogenic liquid storage tank fillet-weld cross section

LNG vacuum cryogenic liquid storage tank fillet-weld cross section

LNG vacuum cryogenic liquid storage tank weld tightness test: remove dirt from the LNG vacuum cryogenic liquid storage tank weld, apply white powder emulsion, spray kerosene on the other side of the weld after drying. Because of the strong penetration of kerosene, if kerosene is sprayed after 12 hours (under low temperature conditions, the time can be extended), if the surface of the welded seam coated with white emulsion has no spots, the welded seam meets the requirements.

Steel Storage Tanks Cover Plates MaterialASTM A516 Gr 55 Carbon Steel Pressure Vessel Plates for LNG vacuum cryogenic liquid storage tankASTM A285, Pressure Vessel Plates for Low- and Intermediate-Tensile StrengthASTM A307 Carbon Steel Bolts and StudsASTM A320 Alloy Steel Bolting Materials for Low-Temperature ServiceASTM A333 Seamless and Welded Steel Pipe for Low-Temperature ServiceASTM A334 Seamless and Welded Carbon and Alloy-Steel Tubes for Low-Temperature ServiceASTM A350 Forgings, Carbon and Low-Alloy Steel for Piping ComponentsASTM A351 Castings for Pressure-Containing PartsASTM A353 Pressure Vessel Plates, Alloy Steel

For areas with high groundwater levels, the operator should take anchoring and anti-floating measures for buried horizontal LNG vacuum cryogenic liquid storage tank oil tanks; API 650 oil tanks can be used for heavy fuel oil, heaters are separately designed, and buried tank material outlets are installed with bottom valves and connections. consider.

In December of 2015, our regular India customer sent us an inquiry for LNG vacuum cryogenic liquid storage tank pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Previous : A573 Gr 70 plates what is api 650 tank

Next : LNG full containment tank manway necks

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12