Nigeria Crude Oil Storage Tank Project
Nigeria Crude Oil Storage Tank Project
In the 2017, after six months negotiation, the Nigeria customer finally place the order of Crude Oil Storage Tank Project. After the Semi-finished products arrive in Nigeria, our engineers guided the local workers to manufacture the storage tank. There were a series of operations like laying the floor, dome plate splicing, the first layer of wall panel and the top panel are docked, welding of the first wall panel and the second wall panel, butt joint and welding of wall panels, welding of ladder and tank top guardrail, the main body of the oil tank is completed and supervised to the project site for acceptance, grind welds, apply top coat.
Previous : API 620 Welded Storage Tanks For Distribution for Bangladesh oil depot project