24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

45 ft in diameter water steel tank maximum joint efficiencies

45 ft in diameter water steel tank maximum joint efficiencies

45 ft in diameter water steel tank maximum joint efficiencies

The manufacturing requirements of bottom plate of vertical metal tank, 45 ft in diameter water steel tank are as follows: 1. In order to compensate welding shrinkage, the layout diameter of tank bottom is 5-2mm than the design diameter; 2. The butt joint of edge plate of tank bottom shall be machined automatically or semi-automatically; 3. The distance between any two adjacent welding joints on the tank bottom plate and the distance between the butt joint of edge plate and the longitudinal weld of bottom ring wall plate shall not be greater than 200 mm.

Vertical Storage Tanks Security against Damage
The assemblies of relieving devices shall be secured against damage in service, the effects of storms, or mishandling. Access ladders and platforms that meet 45 ft in diameter water steel tank plant safety rules are suggested.
Vacuum-relieving Devices
A vacuum-relieving device, when used, shall be as direct in inflow as possible with no pockets where moisture can collect, and it shall have no piping except a weather hood ahead of the inlet. An adequate vacuum-air inlet shall also be provided.

The inner layer of API 650 tank is the same as that of single layer tank. It is made of high-quality steel plate in strict accordance with the standard of "steel welded atmospheric pressure vessel". The thickness of 45 ft in diameter water steel tank steel plate reaches the standard and the service life is longer.

In December of 2015, our regular India customer sent us an inquiry for 45 ft in diameter water steel tank pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Previous : API 620 steel storage tank material backfill and grading

Next : 40 in. in diameter storage tank 20-in. inside-diameter nozzle

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12