24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

API650 bolted steel tanks for oil project filler metal

API650 bolted steel tanks for oil project filler metal

API650 bolted steel tanks for oil project filler metal

Generally, the building area temperature of the API650 bolted steel tanks for oil project should be considered before the tank design and construction. The temperature in the API650 bolted steel tanks for oil project building area is closely related to the evaporation loss, energy loss, storage tank materials and the selection of detection instruments, or has a direct impact on the storage cost of the storage liquid. For the same medium, the higher the air temperature and the longer the duration, the higher the material temperature in the API650 bolted steel tanks for oil project, the higher the corresponding pressure and the more volatile loss.

In the final analysis, the market competition is the competition for customers. Whether selling products or services, the final customer satisfaction is the standard to test the success or failure of marketing work. The so-called after-sales service is to fully understand customers, study customer psychology, pay attention to after-sales details, improve work shortcomings, improve service quality, and Exchange customer brand loyalty through the whole process of quality service.

Steel logistics takes “steel” as the carrier, “logistics” as the operation, and “information” as the core. It integrates steel trade, e-commerce, and tripartite logistics as one. The flow of funds, information, and logistics promote each other and integrate with each other. Construction industry, metallurgy industry, information industry, modern logistics cross-industry. Our logistics service team will make sure our goods delivered to the leaving port on time.Makes you worry-free after sales.

Preheating should be performed by heating and maintaining this heat in appreciable lengths of the joint to be welded, preferably using a strip burner with a mild flame rather than a harsh flame such as that from a cutting torch. Electrical strip heaters are available and have been found to be satisfactory. The preheat of 300°F should be checked with a temperature-sensitive crayon, or similarly accurate means, so that the steel 4 in. (or four times the API650 bolted steel tanks for oil project plate thickness, whichever is greater) on each side of the joint will be maintained at the minimum preheat temperature. Ring burners or heaters are recommended for nozzle and manway welds. At no time during the welding should the base metal fall below a temperature of 300°F.

Previous : welded steel tank for sale accessories

Next : API620 steel storage tank shapes non-removable legs

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12