API650 crude oil storage tank primary components nameplates

API650 crude oil storage tank primary components nameplates

API650 crude oil storage tank primary components nameplates

The API650 crude oil storage tank primary components stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.
Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.

The company has a professional after-sales service team and good after-sales service reputation, providing full and uninterrupted after-sales service, to ensure timely and rapid solution to customer problems. The company is recognized as a 5-star brand of market quality cost performance and customer satisfaction by Market Research Center, and rated as "AAA credit enterprise of enterprise credit evaluation", and also a leading steel producer and service provider in the world.

Steel transportation because of the special material of API650 crude oil storage tank primary components steel, is a metal with "iron" as the main basic element, small volume and large weight, and easy to oxidize and rust when contacting with air and rain water, so there are many precautions in the transportation of steel. There are 11 proverbs for steel transportation: "evenly placed, moisture-proof and rust proof". Our company chooses the logistics aspect to be very rigorous, takes the customer's request as the standard, guarantees the steel product quality.

Welding inspection of bottom plate of API650 crude oil storage tank primary components, vertical oil tank: During the fabrication and installation of API650 crude oil storage tank primary components, the bottom edge plate is welded first. According to the requirements of the technical standard, penetrant inspection is required for the weld of edge plate at the bottom of API650 crude oil storage tank primary components, that is, penetrant testing is required for each weld bead priming, filling and capping. In the process of testing, if any defect is found, it shall be repaired immediately. After the repair, the surface coloring penetrant test shall be conducted again until the test result is qualified.

Previous : A516 Gr 415 plates API650 oil tank primary components

Next : A537 Cl 2 plates api 620 tank primary components

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12