API650 oil tank primary components construction must adhere to the design drawings, acceptance specifications and construction plans. If the design needs to be modified during API650 oil tank primary components construction, it must be approved by the original design unit or Party A’s representative and relevant personnel of the supervision unit, and written visa procedures must be completed in advance. The equipment and main materials used in the oil tank construction project must have certificates of conformity and quality assurance.

Any joints between the adjacent sections of API 620 oil storage tank stiffening rings, as shown in Figure Q-1, shall be made so that the required moment of inertia of the combined ring-shell section is provided. Weld joints between adjacent sections shall be made with full-thickness and full-penetration butt-welds. Stiffening-ring butt-welds may employ metal backing strips. Backing strips and the associated welding shall be made in a manner that provides a smooth contour in the rat hole and all other weld joint ends. All weld passes shall be started at the rat hole and other weld joint ends and shall be completed by moving away from these ends. Passes shall be overlapped away from edges to provide a smooth continuous weld.

Before pressure test, the main drain hose system of API 650 petroleum storage tank floating roof should be thoroughly flushed. Provide blind flanges, gaskets and bolts required for the API650 oil tank primary components test (other types of covers are also required if necessary). Covers for maintenance shall be provided in accordance with the interfaces specified by API 650 petroleum storage tanks, and these seals shall remain in place after the test; and for those interfaces that are not provided for maintenance covers, the covers can be removed after the API650 oil tank primary components test.

In December of 2015, our regular India customer sent us an inquiry for API650 oil tank primary components pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Previous : API620 steel storage tank primary components pipe connections nozzle

Next : API650 crude oil storage tank primary components roof nozzles

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12