24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

Seismic effects in custom API650 crude oil tank

Seismic effects in custom API650 crude oil tank

Seismic effects in custom API650 crude oil tank

When the anchorage is designed to meet the requirements of API Standard 620 tank Q.3.6.4.2, the foundation should be designed to resist the uplift that results from three times the design pressure with the tank full to the design liquid level. When designing to any of the conditions in this paragraph, it is permissible to utilize friction between the soil and the vertical face of the ringwall and all of the effective liquid weight.

The company strengthens process management and pays attention to assessment. One of the key points of good service is to strengthen the process management and improve the evaluation mechanism. Make the after-sales service system more perfect and provide better service for customers.

The company adheres to the needs of customers, adheres to win-win integrity, and relies on scientific and technological innovation to continue to improve the level of logistics equipment technology and information technology, and enhance the logistics technology research and development and innovation capabilities. Based on market demand and innovation as the driving force for development, the company actively expands the field of logistics services, accelerates the extension of the logistics industry chain, and scientifically advances the diversification of the logistics industry.

We have new significant custom API650 crude oil tank projects in Nigeria. It is about crude oil storage tanks. With the development of our steel materials business in the Africa those years, Nigeria has been an important market to us. And we have many custom API650 crude oil tank famous projects in local and also participated in a lot of governmental projects. This crude oil storage tanks project is a very big engineering, and lasts for years. This is the only initial stage. We are under negotiation about following installation and further demands etc. matters.

Previous : Bolted tank vs welded tank for small internal pressures

Next : 5456 aluminum rod Store crude oil API650 tank

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12