24/7 Phone Services 0086(371)86151827
Send to E-mail [email protected]
[email protected] Xincheng Science & Technology Building High-Tech Development Zone, Zhengzhou, China

vertical steel storage tanks supports for stiffening rings

vertical steel storage tanks supports for stiffening rings

vertical steel storage tanks supports for stiffening rings

Generally, the snow load in the vertical steel storage tanks construction area should be considered before the design and construction of the tank. The snow load in the vertical steel storage tanks construction area has an impact on the tank roof design and operation, especially in the area with large snow load, the roof load of large storage tank with large diameter increases. Anti freezing, heat preservation and waterproof measures shall be taken for the additional facilities of storage tanks, such as pumps, breathing valves, flame arresters, detection instruments and thermal insulation layers.

The company has always been adhering to the business philosophy of "integrity-based, responsibility oriented, quality first, reputation first" and is committed to building a world-class steel materials and service provider. We will continue to work hard to carry forward the enterprise tenet of "quality is the life of the enterprise, survival by quality, development by reputation", and become an enterprise with strong vitality! We always keep it in mind that profit is important to enterprises. But what counts more is social responsibility.

The thickness of the vertical steel storage tanks annular bottom plates shall be in accordance with Table Q-4 (for steel or aluminum, as applicable). The thicknesses shown are minimums. The ring of annual plates shall have a circular outside circumference, but it may have a regular polygonal shape inside the tank shell with the number of sides equal to the number of annular plates. These pieces shall be butt-welded in accordance with Q.7.1.1, Item b. The plates of the first shell course shall be attached to the annular bottom plates by a weld as required by API 620 oil tank 5.9.5 except when a full-penetration weld is used or required (see Q.7.1.1). Butt-welds in annular plates shall be not closer than 12 in. from any vertical weld.

Previous : 5456 aluminum plate to manufacture bolted steel tanks

Next : API 620 carbon steel tank grade

Leave a message

Client Image 1
Client Image 2
Client Image 3
Client Image 4
Client Image 5
Client Image 6
Client Image 7
Client Image 8
Client Image 9
Client Image 10
Client Image 11
Client Image 12